The final test station is formed as an independent structure made of aluminum profile on which the elements of the following process modules or functional units are arranged:
At the control and visualization level, the station is equipped with its corresponding controller (PLC) and display (HMI).
Process module # 1: WP1. Part loading / unloading
In this module it is carried out:
Process module # 2: WP2. Electrical electronic circuit test (serial number)
In this module it is carried out:
Process module # 3: WP3. Laser marking
In this module it is carried out:
The DCM code that is marked on the ECUs is a 5 x 5mm DCM with 25 characters with drawing information.
Process module nº 4: WP4.
In this module it is carried out:
February 17, 2016